The construction of the first seventeen kilometer-long section of Europe motorway connecting the towns of Dragoman and Slivnitsa has been completed, Road Infrastructure Agency announced, BTA informs. Construction works ended six months ahead of schedule. The section is part of the Pan-European corridor London-Budapest-Belgrade-Sofia-Plovdiv-Istanbul-Calcutta, which is the shortest road connecting Western Europe, the Near East and the Middle East.
Europe motorway connecting Kalotina border crossing and Bulgaria’s capital Sofia is 48 kilometers long. Construction of the 14.5 kilometer section between the Bulgaria-Serbia border and the town of Dragoman continues.
The third section of the motorway between Slivnitsa and Sofia will be 16 kilometers long. The technical design of the new section is being prepared.
The leader of "We Continue the Change", Asen Vassilev, described the selection of Rumen Spetsov as a special manager at Lukoil as a "bad joke". "Rumen Spetsov was appointed to collect taxes, not to manage a refinery. There is a..
The nominated person for special manager for the four companies of "Lukoil Bulgaria" is Rumen Spetsov, Minister of Economy, Petar Dilov, said. "He meets all legal requirements", Dilov added. The decision was discussed at the Security..
We hope that today Bulgaria will receive a derogation from the US sanctions against Russian company Lukoil, such as the one in Germany - for 6 months. This was what Boyko Borissov, leader of the GERB party, said. In anticipation of..
On Saturday, the lowest temperatures will be between 0 and 5°C; in Sofia - it will be around 0°C. During the day it will be mostly..
The Bulgarian Ministry of Defense is requesting a postponement of one of the large payments under the contract for the second F-16 to 2028. Defense..
Great Britain has issued a special license on Friday that allows businesses to continue to work with two Bulgarian subsidiaries of sanctioned Russian oil..
+359 2 9336 661