After 01.00 on January 22, Unit 5 of Kozloduy NPP was disconnected from the country's energy system. The reason is the activation of protection system during routine operations. There is no deviation from the normal radiation situation, the nuclear power plant reported. There is no leakage of radiation and reason for concerns, the chairman of the Bulgarian Nuclear Regulatory Agency Tsanko Bachiyski has told BNR's Horizont program.
He expects the unit to start operating by the end of the day. Load of hydroelectric and thermal power plants has been increased to compensate for the electricity of the unit. There is no need to import electricity, as currently domestic consumption is not high, the electricity system operator added.
The newly elected Bulgarian Patriarch Daniil attended a reception at the US Embassy on the occasion of Independence Day, BGNES reported. The head of the Bulgarian Orthodox Church was invited by Ambassador Kenneth Merten to attend the..
Humanitarian aid provided by Bulgaria to the civilian population of Gaza was loaded in trucks that departed for the region on June 29, the Bulgarian Embassy in Jordan announced on Facebook. The shipment includes food, medicine, tents..
President Rumen Radev has held a working meeting with Greek Prime Minister Kyriakos Mitsotakis. In Athens, they discussed the urgent activation of work on strategic bilateral projects. At a briefing, Radev said that the liquefied..
“Five people from the parliamentary group are going to be “torn apart” during the voting for a cabinet but will, most probably, not give their..
The first joint operation of the newly formed Mine Counter Measures Task Group Black Sea involving Bulgaria, Turkey and Romania is to take place July..
The caretaker government has fulfilled its main task successfully – organizing fair and transparent elections for National Assembly and for European..
+359 2 9336 661