“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
Prime Minister Rosen Zhelyazkov and Deputy Prime Minister Tomislav Donchev cancelled the meeting, scheduled for today, of the National Tripartite Council on the draft budget for 2006 after, in an unprecedented move, businesses decided not to take..
The European Commission has presented a proposal for developing high-speed railway lines within the EU until 2040, linking the capitals in the EU, among them a direct link Bucharest-Sofia-Athens. According to the plan, using the trans-European..
President Rumen Radev has returned for a new discussion in parliament the adopted legal amendments, according to which the sale of assets of Russian company Lukoil in the country will take place after a decision of the Council of..
+359 2 9336 661