“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
The Confederation of Labor "Podkrepa" does not support the government's proposed state budget for 2026 , the union announced. As reasons, the second most important trade union in the country points out "the lack of policies and reforms to address..
The phantom ship VIVA 962 has changed at least 10 names and many owners before it surprisingly appeared near Cape Emine on November 1. The crew consists of a captain and a mechanic with Ukrainian passports from Kharkov, reports the "24 Chasa" portal...
More bridges over the Danube are not just a bilateral issue between Bulgaria and Romania – they are a strategic priority for the prosperity of the entire EU and for our collective security within NATO. This was emphasized by Deputy Prime Minister..
Bulgaria is strengthening land, water and air security (including with a drone protection system) at Lukoil's sites on its territory,..
A 6-month reconstruction of the runway and renovation of the aprons start at Burgas Airport. November 10 marks 19 years since the start..
+359 2 9336 661