“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
New parking lots with over 1,000 parking spaces, including special areas for people with limited mobility and electric vehicle charging stations, were opened at Sofia Airport today. The parking lots are divided into short-term and..
A Bulgarian businessman has been charged by the European Public Prosecutor's Office with attempted fraud with Chinese agricultural machinery. He tried to present the machinery as Bulgarian-made. A lawsuit has been filed in the Sofia..
Boyko Boris s ov, leader of the GERB-SDS coalition that won the parliamentary elections on October 27, announced he is withdrawing his candidacy for prime minister. At a briefing at the party headquarters he urged the PP-DB to..
The flu season is expected to peak at the end of December and the beginning of January. In an interview with BNT, general practitioner Dr. Gergana..
After the meeting with his Vietnamese counterpart Luong Cuong in Hanoi, President Rumen Radev emphasized that Bulgaria will continue to support efforts..
The number of crimes committed in the conditions of domestic violence has gone up by 54% since the beginning of the year compared to last year, the..
+359 2 9336 661