“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
The interest of young Bulgarians in studying abroad has risen sharply , with a 30% increase compared to last year. In addition, the number of students leaving for the academic year 2024-2025 has increased by about 11%. This is what Kristina Bozhilova,..
Our most important task at the moment is to ensure the safe return of all Bulgarian citizens who wish to be evacuated from Lebanon, President Rumen Radev told journalists in Burgas. Noting that the escalation of the conflict in the Middle East had..
Half of young people in Bulgaria with a monthly income of more than EUR 1 000 are afraid of financial problems , according to a representative survey by Trend. The "Young People in Bulgaria - Mental Risks, Challenges and Perspectives" survey was..
A State Aviation Operator crew is standing by to fly to Lebanon as soon as the phased evacuation of the Bulgarians there is given a green light. This..
Bulgaria has begun evacuating our fellow citizens who expressed a desire to leave Beirut following Israel's attacks on Lebanon. Some of the Bulgarians..
The speculations of a rise in the price of sunflower oil in the coming months due to the poor harvest in the country will not come to pass, Vladimir..
+359 2 9336 661