Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Road Infrastructure Agency owes more than EUR 300 million to construction companies

Photo: Shumen Municipality

Bulgaria’s Ministry of Regional Development and Public Works is looking for ways to pay more than EUR 300 million to construction companies for road repairs, announced the ministry's press office. A working group has already launched an inspection of the completed construction works on this country’s national road network, assigned by the Road Infrastructure Agency. 

It has also been ascertained that so far, the Road Infrastructure Agency has assigned construction companies the task to do construction works for another EUR 1 billion, taking into consideration that the annual budget for such construction activities amounts to EUR 438 million. The Ministry of Regional Development and Public Works noted that after the end of the inspection, the companies that have fulfilled their obligations in a timely manner and in accordance with the quality standards, will receive their money. 




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria joins European network for cancer care

Bulgaria is joining a European consortium of national cancer centres. Speaking to BNR, Assoc. Prof. Dr. Assia Konsoulova stressed that this is the fruit of many years of effort, "because the Bulgarian patient deserves to be treated in both a cancer centre..

published on 7/8/24 5:58 PM

Code Yellow alert for hot weather issued for all Bulgarian districts on Tuesday

It will be sunny and hot on Tuesday. There will be light to moderate northerly wind. The lowest temperatures will range from 17°C to 22°C, for Sofia 17°C. Maximum temperatures will range from 34°C to 39°C, for Sofia - around 33°C. It will be..

published on 7/8/24 5:20 PM
Reactor No. 6 of the Kozloduy NPP

Kozloduy NPP’s reactor No. 6 reconnected to electricity system

Reactor No. 6 of the Kozloduy Nuclear Power Plant was reconnected to the national electricity system at 9 AM on 8 July. The reactor was disconnected on 15 June for planned preventive maintenance of the functioning of a non-nuclear transformer and a..

published on 7/8/24 11:21 AM