An outage of Kozloduy nuclear power plant's Unit 6 for preventive maintenance is planned as of 29 September.
The preventive technical maintenance and the planned measures connected with the plant’s long-term exploitation will go on until the beginning of November. The reactor will be refueled with fresh nuclear fuel for the next, 27th fuel campaign. During the 12 months of the previous, 26th fuel campaign, reactor No. 6 produced over 8.2 billion kWh of electric energy.
The other, 5th reactor of Kozloduy NPP will continue functioning according to schedule.
On Friday, the lowest temperatures will be between 4°C and 9°C, reaching up to 12°C in the southeast, around 6°C in Sofia . During the next 24 hours, the weather will remain cloudy. It will rain in almost the entire country. During the day, rainfall..
The Varna District Court has released the city’s mayor, Blagomir Kotsev, on a financial bond of €102,258. Before the court’s decision was announced, supporters of the mayor and members of the We Continue the Change party gathered outside the..
Three people, including an Italian citizen, were arrested during last night's protest against the adoption of the 2026 budget in front of the National Assembly, the director of the Sofia Directorate of Internal Affairs, Chief Commissioner Lyubomir..
+359 2 9336 661