An outage of Kozloduy nuclear power plant's Unit 6 for preventive maintenance is planned as of 29 September.
The preventive technical maintenance and the planned measures connected with the plant’s long-term exploitation will go on until the beginning of November. The reactor will be refueled with fresh nuclear fuel for the next, 27th fuel campaign. During the 12 months of the previous, 26th fuel campaign, reactor No. 6 produced over 8.2 billion kWh of electric energy.
The other, 5th reactor of Kozloduy NPP will continue functioning according to schedule.
Romania and Bulgaria have a chance to join the Schengen area by land as of January 2025 , Hungarian Interior Minister Sándor Pinter said after an informal meeting in Budapest of the interior ministers of Hungary, Bulgaria, Romania and Austria ...
The Sofia Christmas Festival will open tonight in the park in front of the National Palace of Culture in the heart of Sofia . The third edition of the festival starts at 6.30 pm with a rich program and attractions - а Ferris wheel, a carousel and..
Yet another, already fifth attempt by MPs to elect a Parliamentary Speaker has failed. Four candidates were put to the vote - Natalia Kiselova from BSP-Unified Left, Petar Petrov from Vazrazhdane, Raya Nazaryan from GERB and Silvi Kirilov from ITN...
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would..
+359 2 9336 661