An outage of Kozloduy nuclear power plant's Unit 6 for preventive maintenance is planned as of 29 September.
The preventive technical maintenance and the planned measures connected with the plant’s long-term exploitation will go on until the beginning of November. The reactor will be refueled with fresh nuclear fuel for the next, 27th fuel campaign. During the 12 months of the previous, 26th fuel campaign, reactor No. 6 produced over 8.2 billion kWh of electric energy.
The other, 5th reactor of Kozloduy NPP will continue functioning according to schedule.
The first marble statue discovered in the ancient city of Heraclea Sintica on 3 July, is probably of Lucius – grandson of Roman Emperor Octavian Augustus, announced Prof. Lyudmil Vagalinski who is in charge of the excavations...
President Rumen Radev, who is paying an official visit to Vietnam, delivered a lecture on the occasion of the 75 th anniversary since the establishment of diplomatic relations between the two countries at the Diplomatic Academy of the Ministry of..
“We find the proposal of Boyko Borissov as premier of Bulgaria absolutely unacceptable, we are not going to be involved in any trading in positions.” This is the answer We Continue the Change/Democratic Bulgaria (PP/DB) gave to the proposal by GERB..
According to unofficial information, the Hungarian Presidency of the Council of the EU has drafted a decision for the full admission of Bulgaria and..
The first marble statue discovered in the ancient city of Heraclea Sintica on 3 July, is probably of Lucius – grandson of Roman Emperor Octavian..
The Bulgarian Hotel and Restaurant Association (BHRA) presented its annual awards for professional achievements in the field of tourism. The Bulgarian..
+359 2 9336 661