An outage of Kozloduy nuclear power plant's Unit 6 for preventive maintenance is planned as of 29 September.
The preventive technical maintenance and the planned measures connected with the plant’s long-term exploitation will go on until the beginning of November. The reactor will be refueled with fresh nuclear fuel for the next, 27th fuel campaign. During the 12 months of the previous, 26th fuel campaign, reactor No. 6 produced over 8.2 billion kWh of electric energy.
The other, 5th reactor of Kozloduy NPP will continue functioning according to schedule.
During the night, the weather will be predominantly clear and calm. There will be fog or low clouds before midday in parts of the lowlands, valleys and around water basins. Minimum temperatures minus 4-1° C., for Sofia around minus 2° C. On..
Bulgarian Debora Mihaylova , who was brutally slashed with a mock knife by her boyfriend Georgi Georgiev , is one of the victims of violence mentioned by Ursula von der Leyen in her address on the occasion of the International Day for the Elimination of..
In a letter to Minister of Education Galin Tsokov, the Bulgarian Industrial Capital Association expresses concern over the state plan for admissions for the 2025-2026 academic year, in which the number of vocational classes in schools are being..
According to unofficial information, the Hungarian Presidency of the Council of the EU has drafted a decision for the full admission of Bulgaria and..
The first marble statue discovered in the ancient city of Heraclea Sintica on 3 July, is probably of Lucius – grandson of Roman Emperor Octavian..
The Bulgarian Hotel and Restaurant Association (BHRA) presented its annual awards for professional achievements in the field of tourism. The Bulgarian..
+359 2 9336 661