The technical approval of the Recovery and Resillience Plan is expected on March 15, after which the assignment of projects can begin, Minister of Finance and Deputy Prime Minister Assen Vassilev said. He confirmed that according to the document, only energy facilities that do not meet environmental standards, such as Brikel and Bobov Dol, would be closed. The Deputy Prime Minister assessed the latest changes in the plan as positive for Bulgaria, especially at the backdrop of the situation in Ukraine.
"It would have affected us much worse if we had accepted the closure of facilities in the Maritsa basin and the construction of a steam and gas plant." The plan includes the construction of facilities for storing electricity through batteries, Assen Vassilev said. According to him, the maintenance of such a facility was a matter of national security, especially in cases of disruption of global supplies and communication routes.
“Borders cannot be changed by force, and Ukraine’s long-term security must be guaranteed”, Bulgaria’s Premier Rossen Zhelyazkov said during a videoconference meeting of the “Coalition of the Willing”, led by French President Emmanuel Macron and UK..
Business forum on the topic "Bulgaria - China: cooperation in the automotive sector" is being held on November 26 in Sofia. Its organizers are the Bulgarian Chamber of Commerce and Industry and the Embassy of the People's Republic of..
The Bulgarian Industrial Capital Association has called for participation in a protest on November 26 against the budget for 2026, which is about to be adopted at second reading. "We call not only our members, but also all..
+359 2 9336 661