Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Bulgaria starts work on implementation of its Recovery Plan on March 15

Photo: BGNES

The technical approval of the Recovery and Resillience Plan is expected on March 15, after which the assignment of projects can begin, Minister of Finance and Deputy Prime Minister Assen Vassilev said. He confirmed that according to the document, only energy facilities that do not meet environmental standards, such as Brikel and Bobov Dol, would be closed. The Deputy Prime Minister assessed the latest changes in the plan as positive for Bulgaria, especially at the backdrop of the situation in Ukraine.

 "It would have affected us much worse if we had accepted the closure of facilities in the Maritsa basin and the construction of a steam and gas plant." The plan includes the construction of facilities for storing electricity through batteries, Assen Vassilev said. According to him, the maintenance of such a facility was a matter of national security, especially in cases of disruption of global supplies and communication routes.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgarian Parliament temporarily bans export of petroleum products

The National Assembly has temporarily banned the export and intra-EU delivery of petroleum products, mainly diesel and aviation fuel. The decision was approved with 135 votes in favour, 4 against, and 42 abstentions, following a proposal submitted by..

published on 10/31/25 6:12 PM

Eurostat: Bulgarians are among Europe's least frequent train users

Passenger rail transport in the EU grew by 5.8% in 2024, according to data published today by Eurostat. Last year, trains carried a total of 443 billion passenger-kilometres, the highest level recorded since the start of Eurostat’s observations in 2004...

published on 10/31/25 6:07 PM

Series of violations found after flood in Elenite resort

An inspection has uncovered numerous violations following the recent flood in the Elenite resort complex. No records of environmental approval for the construction in Elenite were found in the archives of the Ministry of Environment and Water, Minister..

published on 10/31/25 3:50 PM