The technical approval of the Recovery and Resillience Plan is expected on March 15, after which the assignment of projects can begin, Minister of Finance and Deputy Prime Minister Assen Vassilev said. He confirmed that according to the document, only energy facilities that do not meet environmental standards, such as Brikel and Bobov Dol, would be closed. The Deputy Prime Minister assessed the latest changes in the plan as positive for Bulgaria, especially at the backdrop of the situation in Ukraine.
"It would have affected us much worse if we had accepted the closure of facilities in the Maritsa basin and the construction of a steam and gas plant." The plan includes the construction of facilities for storing electricity through batteries, Assen Vassilev said. According to him, the maintenance of such a facility was a matter of national security, especially in cases of disruption of global supplies and communication routes.
Bulgaria has a higher share of women in science, technology, engineering and mathematics (STEM) fields than the European Union average, according to a roundtable discussion on “Women in Innovation” held in Sofia. The forum highlighted that 49% of..
The National Assembly has rejected President Rumen Radev's veto on changes to the State Intelligence Agency Act (SIA) and the State Agency Technical Operations (SATO) Act, according to BNR reporter Maria Fileva. The changes strip the president of the..
Bulgaria wants to continue investing in nuclear energy after more than 50 years of experience in the sector, Energy Minister Zhecho Stankov said on Wednesday. About 70% of Bulgarians support the move, Stankov told a Bulgarian-Korean energy..
Sofia has a new spot for curious minds. Phenomena is a museum where science and art come together — a place to experiment, discover, and get hands-on..
‘In my view, the period between Bulgaria’s liberation and 1944 was especially significant because I believe that the country was then on the right..
+359 2 9336 661