The interconnector with Greece near Komotini is expected to be completed by the end of June and the Azeri gas to flow through it to Bulgaria in September, Prime Minister Kiril Petkov, who inspected the gas route today, said.
According to PM Petkov, Bulgaria has three alternative sources of gas if supplies from Russia are cut off. "This facility can bring 3 bcm, which is Bulgaria's approximate consumption. There are also gas connections through Mesemviria and Turkey, so we are absolutely ready for such a scenario," he said.
Kiril Petkov reminded that the purpose of the interconnector between Bulgaria and Greece was to link the gas transmission networks of the two countries and provide access to the Southern Gas Corridor and a number of new sources of natural gas.
High temperatures and low water levels have led to a mass fish die-off in trout farms, BNT reports. According to the Association of Fish Products Producers in Bulgaria, the problem affects farms across the country, as in some places..
Students of the Bulgarian School “Peyo Yavorov” in Milan are on a five-day trip to Bulgaria under the “Educational Routes” program of the Ministry of Education and Science, the school wrote on its Facebook page. “This year, our..
Over 170 spills of oil and marine fuel have been detected in the Bulgarian Black Sea waters over the past year, according to data from the non-governmental organizations Greenpeace – Bulgaria and SkyTruth. The total area of the..
After the update of pensions under the so-called Swiss rule from July 1 by 8.6%, the average monthly pension of a Bulgarian pensioner for July exceeded..
"There is no control body and it is not clear who checks the sports attractions, as well as who is responsible for their use". This was..
On Tuesday, the air masses over the country will remain unstable. Cloudy skies are expected, there will also be short-term rain showers accompanied by..
+359 2 9336 661