In the early hours of October 19, 2024, Unit 6 of the Kozloduy NPP will be shut down for planned annual maintenance that is expected to last until the end of November. During this time, the planned repair works and recharging of the reactor with fresh nuclear fuel will be carried out.
The fifth power unit of the Kozloduy NPP operates according to the electricity production schedule, it was reported.
Bulgaria has one nuclear power plant - Kozloduy NPP, which has two operating units - No. 5 and No. 6. Nuclear energy provides about 40% of the country's gross electricity production.
On Wednesday , the lowest temperatures will be between 3 and 8°C. In the regions with strong wind it will be up to 10-12°C. In Sofia it will be around 4°C. In the western parts of the Danube Plain and the Upper Thracian Plain it will..
Following a series of fires in the Burgas area last summer, including one that destroyed homes in a local villa district, the Burgas municipality has acquired high-tech drones equipped with thermal cameras, night vision, and 3D imaging . The two..
Illegal migrants from Syria, Iraq and Iran have been discovered in Sofia, and ten members of an organised criminal group have been arrested , Deputy City Prosecutor Desislava Petrova told reporters. Two of those arrested have been charged as the..
+359 2 9336 661