In the early hours of October 19, 2024, Unit 6 of the Kozloduy NPP will be shut down for planned annual maintenance that is expected to last until the end of November. During this time, the planned repair works and recharging of the reactor with fresh nuclear fuel will be carried out.
The fifth power unit of the Kozloduy NPP operates according to the electricity production schedule, it was reported.
Bulgaria has one nuclear power plant - Kozloduy NPP, which has two operating units - No. 5 and No. 6. Nuclear energy provides about 40% of the country's gross electricity production.
The meeting of the Joint Multidisciplinary Commission of Experts on Historical and Educational Issues between Bulgaria and North Macedonia in Skopje ended without progress, BTA reported. On February 21 and 22, the Commission once again..
Police are searching for all those involved in the clashes in front of the European Commission building in Sofia on Saturday, February 22, Bulgaria’s Minister of Interior Daniel Mitov told public broadcaster BNT. ''Outrageous scenes in Sofia..
It will be cold with minimum temperatures between minus 14°C and minus 9°C, in places in the northeastern regions up to minus 16°C, for Sofia - around minus 9°C. On Sunday it will be mostly sunny. Before noon in some places in the plains and..
According to data from Eurostat, Bulgaria has met the final criterion for joining the eurozone, namely price stability, Minister of Finance Temenuzhka..
Sofia has taken over the presidency of the most prestigious local government forum in the Balkans – B40. The capital’s mayor Vasil Terziev accepted the..
The Ministers of Agriculture of Bulgaria, Hungary, Romania and Slovakia have called on the European Commission to restore pre-war import quotas for..
+359 2 9336 661