In recent weeks, the low level of the Danube has not impacted the normal operation of Bulgaria's sole nuclear power plant, Kozloduy, which comprises two units. This information was announced in a press release by the plant.
On 4 July 2025, the water level at the plant was measured at 21.5 metres, which is 53 centimetres higher than the 20.97 metres recorded in late summer 2003.
To ensure the reliable operation of the units, Kozloduy NPP has its own shore pumping station equipped with 34 powerful pumps. The plant stressed that the facility was designed to provide water even at the lowest ever recorded river level, based on data from a century of Danube studies.
Editor: Miglena Ivanova
Posted in English by E. Radkova
A day before the third motion of no confidence in Prime Minister Rosen Zhelyazkov’s cabinet was due to be voted on, the Velichie party submitted a fourth motion. Today, the National Assembly debated the no-confidence vote proposed by..
Fewer and fewer Bulgarians living abroad send their children to Sunday schools where Bulgarian language and culture are taught, said Veneta Nenkova, founder of the Bulgarian school ''Asen and Iliya Peykovi'' in Rome, in an interview with the BNR’s..
Bulgarian MPs are discussing a third vote of no confidence in the government of Rosen Zhelyazkov, BTA reports. According to the initiators from Vazrazhdane, the cabinet has failed in its financial policy. “The cabinet is..
Gorna Oryahovitsa is the largest non-district town in Northern Bulgaria. It is located near Bulgaria’s old capital, Veliko Tarnovo, and is an important..
A new lane for heavy trucks over 12 tons will be opened at the Danube Bridge in Ruse, announced Ruse Regional Governor Dragomir Draganov. The initiative..
On July 7, the Bulgarian National Bank (BNB) puts into circulation a silver commemorative coin titled "175 Years Since the Birth of Ivan Vazov", BNB..
+359 2 9336 661