A BGNES correspondent in Belgrade has reported that Serbian-registered Russian company IDC (Infrastructure Development and Construction), which was the main contractor for the construction of the TurkStream pipeline through Serbia, would be subcontracting more than 100 kilometers of the Bulgarian section of the pipeline. The relevant permission was granted by the Saudi consortium Arkad, with which Bulgarian gas operator Bulgartransgaz has a contract totaling EUR 1.1 billion. The first section of the Turkish Stream gas pipeline in Bulgaria has already been completed by a local company. The construction of the second part is expected to be completed by the next heating season.
Prime Minister Rosen Zhelyazkov said that the state’s representative at Lukoil could include more than one appointed manager, in line with upcoming legal changes. He added that the names of the candidates for special manager or managers would be..
November 10 marks 36 years since the symbolic beginning of the transition from a one-party system to democracy in Bulgaria. The day after the fall of the Berlin Wall a plenum of the then ruling Bulgarian Communist Party ousted its..
Seven-year-old Magdalena Stoyanova from art school "Kolorit" in Pleven received a gold medal and a distinction from the international children's drawing competition "Health 2025". The award ceremony took place in Sao Paulo,..
The Sofia City Court has postponed the extradition case of Igor Grechushkin, the owner of a cargo ship linked to the explosion at the port of Beirut in..
The Road Infrastructure Agency (RIA) has proposed the introduction of temporary restrictions on the movement of heavy trucks weighing over 12 tons along..
Prime Minister Rosen Zhelyazkov said that the state’s representative at Lukoil could include more than one appointed manager, in line with upcoming legal..
+359 2 9336 661