“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
Prime Minister Rosen Zhelyazkov will take part in the solemn celebrations on the occasion of the 140th anniversary of the Serbo-Bulgarian War, which will be held on November 7 - Victory Day in the Battle of Slivnitsa. The ceremony..
Research ship "Sts. Cyril and Methodius" has departed from Varna after a solemn ceremony. In its fourth voyage to Antarctica the ship is expected to reach the Bulgarian Antarctic base on Livingston Island by the end of December and..
The Sofia Police announced that they will use drones to monitor fans before and during the football match between Levski and CSKA, which will be held on Saturday at 3:00 p.m. at the Vasil Levski National Stadium. There will be..
Birth rate in Bulgaria has decreased by 33% over the past three decades. In 1994, 79,442 live births were registered in the country, while in 2024 the..
The police have neutralized an organized crime group that transported migrants from Burgas through Sofia to the Serbian border, Sofia..
The majority in parliament overcame the president's veto on the Investment Promotion Act. The bill was passed in second reading on..
+359 2 9336 661