“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
The 14 th traditional meeting of the Harcoi is taking place today in Katselovo village, Dve Mogili municipality near the city of Russe. The event, taking place under the patronage of Dve Mogili mayor Marieta Petrova, starts at 9.30 AM with a water..
Two of the big puppets from Puppets Occupy Street from Craiova in Romania will be seen in Sofia for the first time as part of the International 6Fest Street Arts Festival. They will appear to a Bulgarian audience from 7.30 until 8.30 PM in..
On Saturday minimum temperatures will range between 16° C. and 23° C., for Sofia 16 ° C. During the day there will be sun with a light, in the Southeastern parts to moderate wind from the East-Northeast. Daytime highs will climb some more,..
The 14 th traditional meeting of the Harcoi is taking place today in Katselovo village, Dve Mogili municipality near the city of Russe. The event,..
+359 2 9336 661