On Saturday, 24 September, Unit 6 of the Kozloduy Nuclear Power Plant is going off stream for scheduled annual maintenance.
The reactor will be refueled for the 28th time. All necessary resources, spare parts and qualified staff have been ensured for the repair and maintenance works. All scheduled works are in accordance with the licence obligations and technological regulations. After the repair and maintenance work is completed at the end of October, reliable and safe energy deliveries will be provided for the autumn and winter period.
Kozloduy NPP’s Unit 5 is functional and generating electricity, the power station says.
‘This is not the time for early elections,’ said Prime Minister Rosen Zhelyazkov at a GERB party conference. According to BTA, he was opposed to holding elections during the country’s planned adoption of the euro in 2026. GERB chairman Boyko..
The Sofia Appellate Court left in custody Varna Mayor Blagomir Kotsev, who is charged with corruption and participation in an organized crime group. The judgment is final. One of the three judges, Andrey Angelov, signed with a dissenting..
Bulgaria’s Minister of Justice Georgi Georgiev conferred in Brussels with the European Commission team responsible for the Resilience and Recovery Plan (RRP) reforms in Bulgaria, reported the Ministry of Justice. EC: RRP payment depends on..
+359 2 9336 661