On Saturday, 24 September, Unit 6 of the Kozloduy Nuclear Power Plant is going off stream for scheduled annual maintenance.
The reactor will be refueled for the 28th time. All necessary resources, spare parts and qualified staff have been ensured for the repair and maintenance works. All scheduled works are in accordance with the licence obligations and technological regulations. After the repair and maintenance work is completed at the end of October, reliable and safe energy deliveries will be provided for the autumn and winter period.
Kozloduy NPP’s Unit 5 is functional and generating electricity, the power station says.
Two more F-16 Block 70 aircraft are expected to arrive in Bulgaria very soon. This was announced by the commander of the Air Force, Major General Nikolay Rusev, in front of journalists. So far, Bulgaria has received four F-16 Block 70 aircraft..
Bulgarian President Rumen Radev has announced that as of October 20 this year he will travel to work in his personal car. “When a law is being adopted that forces people to do state work in their personal cars, I will stand in solidarity with them,” he..
We want to buy a system that has maximum protection against drones. This does not mean that it has a mechanical effect on the drone, but at least that it has some electromagnetic or blocking control of the device. This was explained to BNT by Maj. Gen...
+359 2 9336 661