On Saturday, 24 September, Unit 6 of the Kozloduy Nuclear Power Plant is going off stream for scheduled annual maintenance.
The reactor will be refueled for the 28th time. All necessary resources, spare parts and qualified staff have been ensured for the repair and maintenance works. All scheduled works are in accordance with the licence obligations and technological regulations. After the repair and maintenance work is completed at the end of October, reliable and safe energy deliveries will be provided for the autumn and winter period.
Kozloduy NPP’s Unit 5 is functional and generating electricity, the power station says.
We want to buy a system that has maximum protection against drones. This does not mean that it has a mechanical effect on the drone, but at least that it has some electromagnetic or blocking control of the device. This was explained to BNT by Maj. Gen...
Slovak Ambassador Vasil Grivna was summoned to the Ministry of Foreign Affairs over official statements made by Slovak President Peter Pellegrini during his visit to Skopje on October 14. There were unacceptable assessments made..
On behalf of the Head of State Rumen Radev, Vice President Iliana Iotova presented the Order of Sts. Cyril and Methodius, first degree, to Professor Ma Sipu, the press office of the president reported. The award was presented at..
On Saturday, minimum temperatures will range from 8 to 13°C , around 9°C in Sofia. It will be mostly cloudy with rain in many areas. There will be..
+359 2 9336 661