On Saturday, 24 September, Unit 6 of the Kozloduy Nuclear Power Plant is going off stream for scheduled annual maintenance.
The reactor will be refueled for the 28th time. All necessary resources, spare parts and qualified staff have been ensured for the repair and maintenance works. All scheduled works are in accordance with the licence obligations and technological regulations. After the repair and maintenance work is completed at the end of October, reliable and safe energy deliveries will be provided for the autumn and winter period.
Kozloduy NPP’s Unit 5 is functional and generating electricity, the power station says.
President Rumen Radev has returned for new discussion in the National Assembly the amendments to the State Agency for National Security (SANS) Act, adopted on October 2 this year, which assign the power to appoint or dismiss the chairman of the agency..
On Wednesday, the lowest temperatures will range between 6°C and 11°C, around 7°C in Sofia. Cloud cover will remain significant over most of the country, with rain showers in parts of Eastern Bulgaria and the mountains, more intense in the Rhodope..
In its new World Economic Outlook report, the IMF has raised its forecasts for Bulgarian economic growth this year and next, compared to its estimates from April. At the same time, IMF expects increase in inflation, as well as a decrease in the..
On Saturday, minimum temperatures will range from 8 to 13°C , around 9°C in Sofia. It will be mostly cloudy with rain in many areas. There will be..
+359 2 9336 661