The planned annual repairs of Unit VI of Kozloduy NPP have been completed five days ahead of schedule. On November 1, at 1.41 am, it joined the country's energy system after an inspection and approval by the Nuclear Regulatory Agency.
The unit was stopped on September 29. For 31 days, the capacity of 1,000 megawatts was not part of the electricity market, which caused further rise of energy prices in Bulgaria.
Equipment maintenance has been performed and the unit has been refueled with fresh nuclear fuel. All the planned activities related to increasing the safety and ensuring the long-term operation of the unit have been carried out. The 5th nuclear power unit of Kozloduy is also operating at full capacity, the power plant's head Nasko Mihov said.
Great Britain has issued a special license on Friday that allows businesses to continue to work with two Bulgarian subsidiaries of sanctioned Russian oil company Lukoil, Reuters and BNR Horizont reported. The general license allows companies and banks to..
The leader of "We Continue the Change", Asen Vassilev, described the selection of Rumen Spetsov as a special manager at Lukoil as a "bad joke". "Rumen Spetsov was appointed to collect taxes, not to manage a refinery. There is a..
The nominated person for special manager for the four companies of "Lukoil Bulgaria" is Rumen Spetsov, Minister of Economy, Petar Dilov, said. "He meets all legal requirements", Dilov added. The decision was discussed at the Security..
In 2026, Bulgaria will assume the presidency of the EU Strategy for the Danube Region for the second time. The symbolic handover of the presidency took..
“The storm has mostly passed, but there are still risks”, Deputy Premier Tomislav Donchev told bTV regarding Lukoil . ''The first priority is to..
Bulgaria has no additional conditions from the United States for the exception of the sanctions imposed on Lukoil to enter into force, Minister of..
+359 2 9336 661