On Saturday, 24 September, Unit 6 of the Kozloduy Nuclear Power Plant is going off stream for scheduled annual maintenance.
The reactor will be refueled for the 28th time. All necessary resources, spare parts and qualified staff have been ensured for the repair and maintenance works. All scheduled works are in accordance with the licence obligations and technological regulations. After the repair and maintenance work is completed at the end of October, reliable and safe energy deliveries will be provided for the autumn and winter period.
Kozloduy NPP’s Unit 5 is functional and generating electricity, the power station says.
On the occasion of the Aviation and Air Force Day on October 16, at 09:00, flowers and wreaths will be laid at the Aviators Monument near the National Assembly in the capital city, the Ministry of Defense reports. The solemn..
On Thursday , the lowest temperatures will be between 4 and 9°C; in Sofia – about 4°C. During the day, there will be significant cloudiness over many regions of the country. There will be light rainfall in places in the southeastern..
Between January and September 2025, Bulgaria’s capital recorded a 10% increase in tourist arrivals and a 6% rise in overnight stays compared with the same period in 2024, according to data from the Unified Tourist Information System (ESTI). The municipal..
+359 2 9336 661