On Saturday, 24 September, Unit 6 of the Kozloduy Nuclear Power Plant is going off stream for scheduled annual maintenance.
The reactor will be refueled for the 28th time. All necessary resources, spare parts and qualified staff have been ensured for the repair and maintenance works. All scheduled works are in accordance with the licence obligations and technological regulations. After the repair and maintenance work is completed at the end of October, reliable and safe energy deliveries will be provided for the autumn and winter period.
Kozloduy NPP’s Unit 5 is functional and generating electricity, the power station says.
The trial of six Bulgarians accused of spying for Russia continues in the United Kingdom. The head of the "spy cell" Orlin Rusev and Biser Dzhambazov pleaded guilty. Three others - Katrin Ivanova, Vanya Gaberova and Tihomir..
Today's eighth attempt by the Bulgarian MPs to elect a speaker of the National Assembly also proved unsuccessful. At the beginning of the day, there was a ray of hope that this time the people's representatives would reach a..
Public attitudes towards HIV/AIDS in Bulgaria show that a quarter of Bulgarians are ready to keep friendships with HIV-positive people, BTA reported. Men are slightly more tolerant than women (28% versus 23%). The data are from a..
The Democrats for a Strong Bulgaria (DSB) are to nominate the party’s leader Atanas Atanasov for president of the 51 st National Assembly...
A Eurobarometer survey has registered the highest level of trust in the European Union since 2007 and the highest level of support ever for the common..
The financial effect of our country's accession to Schengen by land will amount to BGN 1.63 billion (EUR 833.4 million) per year, according to a study..
+359 2 9336 661