On Saturday, 24 September, Unit 6 of the Kozloduy Nuclear Power Plant is going off stream for scheduled annual maintenance.
The reactor will be refueled for the 28th time. All necessary resources, spare parts and qualified staff have been ensured for the repair and maintenance works. All scheduled works are in accordance with the licence obligations and technological regulations. After the repair and maintenance work is completed at the end of October, reliable and safe energy deliveries will be provided for the autumn and winter period.
Kozloduy NPP’s Unit 5 is functional and generating electricity, the power station says.
The People's Republic of China is introducing a visa-free regime for holders of Bulgarian passports for business purposes, tourism, visiting relatives or friends, official visits or transit, for no more than 30 days. The Situation..
Bulgarian MPs are meeting today for the seventh time in an attempt to elect a speaker of the 51st National Assembly after the first six failed to produce a result. This is how the first session of the new parliament, which began on November 11, continues..
The Real Estate Business Forum "Standards of the Future in Our Living Environment" will bring together experts in Sofia today. The focus of the discussions will be on the real estate market in the Bulgarian capital and the region. An analysis of..
Due to the poor condition of the water transmission network, nearly half a billion cubic meters of water are irretrievably lost annually . On this..
"After today's vote for Speaker of the National Assembly, ''We Continue the Change'' (PP) demanded the resignations of Daniel Lorer and Yavor..
On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed..
+359 2 9336 661